Skip to content

SERVICES

BESPOKEWEB APPS

I build the first real version, holding only what you need now.

WHAT IT COSTS

Internal tool €5000 – €35,000

MVP €9000 – €70,000

HOW LONG IT TAKES

6–16 weeksafter the scope is defined

THE SAME WORK, LIVE

Map of Italy with every project marked by its status
The Fondazione Stelion site on a phone, showing the project map

Map of Italy with every project marked by its status

FONDAZIONE STELION

The process has outgrown what a spreadsheet or an automation can hold. It needs users, roles, connected data and a round that stands up daily. Building the big version straight away is the slowest way to get there.

  1. Understand the problem

    I start from the definition sprint: problem, users, priority step, data sources and risks. Before writing code at full rate.

  2. Define the perimeter

    I settle what goes into the first version and what stays out. That decision is what makes a real delivery date possible.

  3. Build

    I build the main interfaces, the database and the priority step. With authentication where the data calls for it.

  4. Make it maintainable

    I hand over with checks, documentation and a handover session. The team uses it without waiting on me for every change.

WHAT IT IS NOT

It does not start without a written scope: the definition sprint is compulsory. And the first version is not a finished product: it holds what you need now, not everything imaginable.

WHERE I HAVE DONE IT

Why is a definition sprint always required?
Because apps and MVPs carry more variables — users, roles, data, integrations — than a first look shows. The sprint costs €800 to €2,000 and stops me building the wrong thing well.
Do you work alone on something this size?
Yes. Whoever hears the problem writes the code and hands it over. The flip side is capacity: I take few projects at a time and the dates are real, not optimistic.
How long does it take?
Usually 6 to 16 weeks after the scope is defined. The variable is how still the scope stays once we start.

Tell me which process has jammed.

Let's talk

WHAT IT COSTS

Internal tool €5000 – €35,000

MVP €9000 – €70,000

HOW LONG IT TAKES

6–16 weeksafter the scope is defined

Prices and termsThe definition sprint